top of page
Search

A Guide to Decorating Rental Voids Properly

Writer: Wix
Wix
Sep 11
6 min read

A vacant rental property costs money every day it sits empty, but rushing the decorating can create a different problem: a tired-looking home that takes longer to let, attracts lower offers or needs remedial work after only a few months. This guide to decorating rental voids explains how landlords and property managers can make sensible decisions between tenancies, balancing presentation, durability, budget and turnaround time.

For properties in Crawley, Surrey and Sussex, where prospective tenants can often view several homes in one afternoon, the condition of the paintwork and finishes matters. Clean, consistent rooms suggest a well-managed property. Peeling paint, poor patch repairs and mismatched colours can suggest the opposite, even where the property is otherwise sound.

Start with an honest condition check

Before choosing colours or booking decorators, inspect the whole property in good daylight. A void period is the best opportunity to deal with issues that are difficult to address while tenants are in residence. Look beyond obvious scuffs on walls and assess ceilings, woodwork, door frames, staircases, kitchens, bathrooms and communal areas where applicable.

Separate work into three categories: essential repairs, presentation upgrades and work that can reasonably wait. Essential repairs include water staining, cracked or blown plaster, mould caused by an underlying defect, loose wallpaper and damaged surfaces. These must be dealt with properly before decorating begins. Painting over a stain or damp patch may improve the appearance for a short time, but it will not solve the cause and can lead to a complaint later.

Presentation upgrades may include freshening tired neutral walls, repainting marked skirting boards, repairing picture-hook holes or removing dated feature wallpaper. These are usually worthwhile when they help the property photograph better and feel ready for occupation. Less urgent improvements, such as replacing otherwise serviceable finishes in low-wear rooms, can be planned for a future refurbishment.

A good inspection also helps avoid surprises in a quotation. Clear information about what needs repairing, what is being retained and the required standard of finish allows the work to be priced accurately from the start.

Set the right standard for the property

Not every rental needs the same specification. A high-end family home, a student let, a furnished flat and a commercial unit all experience wear differently. The goal is not to use the cheapest paint available or to over-specify every room. It is to choose finishes that suit the tenant profile, expected use and rent level.

For most rental homes, a clean neutral scheme remains the practical choice. Warm whites, soft greys and light off-whites make rooms feel brighter, work with different furniture styles and make future touch-ups easier. Strong colours can work in the right property, but they are more likely to need repainting when the next tenant has different tastes.

Consistency is valuable. Keeping a written record of wall, ceiling and woodwork colours, paint brands and finishes makes maintenance simpler during future voids. If a hallway needs a repair two years later, the correct colour can be sourced rather than guessed.

Choose paint finishes for real life

Matt emulsion is popular because it gives walls a calm, modern appearance and hides minor surface unevenness. However, standard matt can mark easily in busy hallways, on stairwells and around switches. In these areas, a durable washable matt or a suitable low-sheen finish may be a better investment.

Satinwood or eggshell is often chosen for internal woodwork because it is hard-wearing and easier to clean than a flat finish. Bathrooms and kitchens need paints suited to moisture and regular cleaning. Where condensation or mould has occurred, the underlying ventilation, extraction and heating issues should be checked first. Specialist paint can assist in suitable circumstances, but it is not a replacement for fixing the cause.

The cheapest option can appear attractive during a void, particularly where several properties need attention. Yet low-grade paint may require more coats, cover poorly over previous colours and show marks sooner. A better-quality trade paint, applied over properly prepared surfaces, often gives better value over the length of a tenancy.

Preparation protects the finish

The visible paint coat is only one part of a successful redecoration. Much of the quality and durability comes from the work completed beforehand. Walls should be cleaned where needed, loose material removed, cracks opened and filled correctly, and damaged plaster repaired before sanding and priming.

This is particularly relevant in rental voids, where quick patching over years of occupancy can leave uneven walls and obvious repair marks. A professional decorator will assess whether a small filler repair is enough or whether a wider area needs skimming, lining or more substantial preparation to achieve a sound result.

Stains from leaks, smoke or heavy furniture should be sealed with the correct product before finishing coats are applied. Simply painting over them with emulsion can allow discolouration to bleed back through. Glossy or previously poorly painted surfaces may also need suitable preparation so that new coatings adhere properly.

Dust control deserves consideration too. Sanding is often necessary for smooth repairs and well-finished woodwork, but unmanaged dust can spread through an empty property and add cleaning time before viewings. Professional dustless sanding equipment, together with floor protection and tidy working methods, helps keep the turnaround controlled.

Plan the work around the void period

A short void does not always mean a small job. Drying times, repairs, access arrangements and the condition left by the outgoing tenant can all affect the schedule. The best approach is to arrange an inspection as early as possible, ideally before check-out or immediately afterwards, so work can be planned without losing unnecessary days.

Where several trades are involved, the order matters. Resolve plumbing leaks, electrical alterations, plaster repairs and any remedial works before final decorating. Otherwise, freshly painted walls may be damaged by later work. If carpets are being replaced, discuss the sequence in advance. Decorating before new flooring is usually simpler, although existing floor coverings still need careful protection if they are staying.

For a larger property or a full refurbishment, it may be sensible to phase the work room by room. This can allow cleaners, inventory clerks and letting agents to plan their visits without everyone working in the same space. However, splitting a small decorating job into too many visits can increase cost and delay completion, so the right arrangement depends on the property and deadline.

Keep void decorating costs under control

The most effective way to control cost is to be clear about the scope. Decide whether each room needs a full redecoration, a wall-only refresh or targeted repairs. A landlord does not need to repaint every surface at every change of tenancy, but visible damage should not be ignored simply because it is limited to one area.

A detailed written quotation should explain what preparation is included, which areas will be painted, the paint specification, any repairs allowed for and whether materials are included. This gives you a reliable basis for comparing work and avoids assuming that two prices cover the same standard.

Be wary of a quote that appears much lower than others without a clear explanation. It may exclude preparation, use lower-quality materials or allow too little time for a durable finish. Equally, a full redecoration is not always necessary. An experienced decorator can advise when careful repairs and repainting selected areas will achieve a professional, tenant-ready result.

Landlords should also keep records of condition, invoices and colours used. These are useful for planned maintenance, deposit discussions where appropriate and budgeting across a portfolio.

A practical checklist before marketing

Before photography, viewings or an inventory appointment, check that the property is genuinely ready rather than merely painted. The following points are worth confirming:

  • Walls and ceilings are clean, evenly finished and free from visible filler marks or stains.

  • Doors, skirting boards, frames and window sills have been repaired and painted where required.

  • Any damp, mould or water staining has had its cause investigated and addressed.

  • Floors, fittings and remaining furniture have been protected throughout the work and cleaned afterwards.

  • Paint colours and finishes have been recorded for future maintenance.

Small details make a difference at this stage. Remove masking tape, check around sockets and radiators, ensure windows open cleanly and look at each room from the doorway. This is how most prospective tenants will first see it.

When professional decorating is the sensible choice

A simple touch-up can be manageable for a landlord with the right materials and time. But full void decorating often involves more than applying a coat of paint. Surface repairs, stain blocking, wallpaper removal, woodwork preparation and working to a fixed letting deadline all need to be coordinated.

For landlords who want a clear scope of work and minimal disruption, Ellis Painting & Decorating provides a professional service built around careful preparation, tidy working and durable finishes. With experienced, insured decorators and dustless sanding equipment, the focus is on helping a property look well cared for without creating unnecessary mess or uncertainty during a busy turnaround.

A rental void is not simply lost time between tenancies. Treated properly, it is a useful maintenance window that protects the property, improves its appeal and gives the next tenant confidence from the moment they walk through the door.

 
 
 

Comments


bottom of page